1 PT Pertamina (Persero) RU VI Balongan Spark Erosion untuk Breech Closure 13-E-101A/B PCM TH 2013 Pertamina RU VI – Balongan 2013
2 PT. Tripatra Engineers and Constructors Assist Commisioning Mechanical Tools Exxon – Cepu 2014
3 PT. Tripatra Engineers and Constructors Rental Electrical, Instrumen, dan Telecom Tools Assit. Com Exxon – Bojonegoro 2014
4 PT. Tripatra Engineers and Constructors Rental Hydraulic Jacks 30 Ton & 50 Ton Exxon – Bojonegoro 2014
5 PT. Tripatra Engineers and Constructors Training Mechanical Tools Exxon – Bojonegoro 2014
6 PT. Tripatra Engineers and Constructors Rental Hydraulic Jacks Bulanan 30 Ton & 50 Ton Exxon – Bojonegoro 2014
7 PT. Tripatra Engineers and Constructors Rental Magnetic Drill Exxon – Bojonegoro 2014
8 PT. Samsung Engineering Pembuatan Pintu Kompressor Exxon – Bojonegoro 2014
9 PT. Tripatra Engineers and Constructors Rental Tension Meter & Dynamometer Exxon – Bojonegoro 2015
10 PT. Tripatra Engineers and Constructors Rental Mechanical, Elec, Instrument, Process, Telecom 2015 Exxon – Bojonegoro 2015
11 PT. Tripatra Engineers and Constructors Media Blowing Program throught the Facilities. ( Pipe line cleaning) Exxon – Bojonegoro 2015
12 PT. Sumitomo Heavy Industries Indonesia Modification Ducting and Muffler Safe Heaven Generator Exxon – Bojonegoro 2015
13 PT. Tripatra Engineers and Constructors GTG – Stack, Silencer &Enclosure Exxon – Bojonegoro 2015
14 PT. Tripatra Engineers and Constructors Rental Magnetic Drill Exxon – Bojonegoro 2015
15 PT. Tripatra Engineers and Constructors Rental Wire Tension Flare Stack HP Service Include: Exxon – Bojonegoro 2015
16 PT. Tripatra Engineers and Constructors Rental Hydraulic Jack 30 & 50 Ton Exxon – Bojonegoro 2015
17 PT. Tripatra Engineers and Constructors Hydraulic Jack kapasitas 30 Ton ( Enerpac 30 T RCS 302 + Hose + Handpump) 2 set Exxon – Bojonegoro 2015
18 PT. Tripatra Engineers and Constructors Hydraulic Jack kapasitas 50 Ton ( Enerpac 50 T RCS 506 + Hose + Handpump) 2 set Exxon – Bojonegoro 2015
19 PT. Tripatra Engineers and Constructors Manpower (Specialist Technician) 8 Person Exxon – Bojonegoro 2015
20 PT. Tripatra Engineers and Constructors Repair Flange Of Discharge CPF Closed Darin Pump Exxon – Bojonegoro 2015
21 PT. Tripatra Engineers and Constructors For Killing Punch List At Fuel Day Tank – Diesel Fire Pump A/B/C Exxon – Bojonegoro 2015
22 PT. Tripatra Engineers and Constructors For Lubrication Extention Line at Fuel Gas Compressor & Sulfur Pelletizer Cooler Exxon – Bojonegoro 2015
23 PT. Tripatra Engineers and Constructors Rental Magnetic Drill Exxon – Bojonegoro 2015
24 PT. Tripatra Engineers and Constructors Repair LP Demister Blower Casing at Gas Lift Compressor Exxon – Bojonegoro 2015
25 PT. Tripatra Engineers and Constructors Supply Material for Cover Plate of N2 Compressor AE 100 Exxon – Bojonegoro 2015
26 PT. Tripatra Engineers and Constructors Modification Ducting and Muffler Safe Heaven Generator Exxon – Bojonegoro 2015
27 PT. Tripatra Engineers and Constructors Rental Hydraulic Enerpack Jack 50 & 30 ton Area Wellpad Exxon – Bojonegoro 2015
28 PT. Tripatra Engineers and Constructors Rental Hydraulic Enerpack Jack 50 ton Area 1200/1400 Exxon – Bojonegoro 2015
29 PT. Tripatra Engineers and Constructors Supply Man Power ( 1 Oktober – 1 Januari 2016) 49 orang Exxon – Bojonegoro 2015
30 PT. Tripatra Engineers and Constructors Repair Gearbox Travel Motor 8/2 F 12/220.223 (WOH472611) Exxon – Bojonegoro 2015
31 PT. Tripatra Engineers and Constructors Repair Cover Hoist Motor 12/2H33 – MF10Z-106 Exxon – Bojonegoro 2015
32 PT. Tripatra Engineers and Constructors FMR Project Request (sepanjang tahun 2015) Exxon – Bojonegoro 2015
33 PT. Sumitomo Heavy Industries Indonesia Safety Sign Sumitomo Corp – Sulawesi 2015
34 PT. Sumitomo Heavy Industries Indonesia Safety Sign II Sumitomo Corp – Sulawesi 2015
35 PT. Sumitomo Heavy Industries Indonesia Supply Material Sumitomo Corp – Sulawesi 2015
36 PT. Sumitomo Heavy Industries Indonesia Pengadaan Materiak (Floating Dust, Baricade Tape, dll) Sumitomo Corp – Sulawesi 2015
37 PT. Tripatra Engineers and Constructors Gasket Spiral Wound Exxon – Bojonegoro 2016
38 PT. Tripatra Engineers and Constructors Assembly of two wall hangers mounted at plate and bolted on cabinet wall Exxon – Bojonegoro 2016